PM Modi's online address.
The Girnar ropeway project has been constructed by Usha Braco Company at a cost of Rs 130 crore
PM Narendra Modi launched a virtual Kisan Sarvodaya Yojana for farmers
Asia's largest ropeway Girnar ropeway has been e-launched by PM Narendra Modi. Other ministers including CM Vijay Rupani are present in Junagadh for the e-inauguration program of Girnar Ropeway. Along with the e-inauguration of Girnar ropeway at the hands of PM Narendra Modi, Kisan Suryodaya Yojana has also been launched. The ropeway will cover a distance of 2.3 kilometers in just 8 minutes. The Girnar ropeway project has been constructed by Usha Braco Company at a cost of Rs 130 crore. Importantly, the people of Junagadh are most curious about the Girnar ropeway.
The country's first project to make the Girnar ropeway through the helicopter
is the first project at the Girnar ropeway in the country via helicopter. The ropeway coach launched at Girnar will pass at a speed of 6 meters per second. The ropeway built at Ambaji runs at a speed of 2.75 meters per second.
The rope
used in the ropeway is ordered from Germany The rope used in the Girnar ropeway is ordered from Germany. The ropeway will be able to carry 800 people per hour. 9 towers have been installed along the 2.3 km route. The length of 1 tower is kept at 66 feet. At present 24 trolleys are in operation on the ropeway, while the number of other trolleys will be increased as required. A trolley will seat 8 people. 192 visitors can go in one round. The speed of each trolley will be 5 minutes per second. The distance between the two trolleys is 216 m. (36 seconds). In 1 hour 800 visitors will be able to walk from the foothills to the temple.
E-launch of Girnar ropeway today.
The ropeway was designed keeping in view the wind speed on
Girnar. The height of Girnar mountain is 3,500 feet. The highest peak is 3,666 feet high. The wind speed here is 180 kmph. Live per hour. The ropeway design is aerodynamic to counter this. 9 towers have been erected for the ropeway. Tower No. 6 is the tallest (approximately 67 m), close to the last step of Girnar. The height of M between each tower is kept at 7-8 floors.
More labor will be required on Girnar after the start of the ropeway. With the commencement of the
Girnar ropeway, the flow of pilgrims will now increase. People will have to stand in the food stalls for footpaths on the way to their destination, so the consumption of goods will increase there and more labor will be required to deliver it. At present, only ropeways are allowed for pilgrims. Not approved for goods.
Read in Gujarati news
Fare: Two-way ticket for adults 700, Rs 350 for children
. Two-way ticket rates for people over the age of 16 are Rs. 700, while one-way tickets cost Rs. Will be 400. Ticket rates for children are Rs. 350 is kept. With the construction of the ropeway, it has set a revenue target of Rs 400 crore annually.
Fare: Two-way ticket for adults 700, Rs 350 for children
. Two-way ticket rates for people over the age of 16 are Rs. 700, while one-way tickets cost Rs. Will be 400. Ticket rates for children are Rs. 350 is kept. With the construction of the ropeway, it has set a revenue target of Rs 400 crore annually.
No comments:
Post a Comment